Wednesday, June 30, 2010

3 Phase board
















This was an interesting exercise as the following results will show.



Problems found:

conductor insulation visible, hot water element visible, a number of switches exposed, bad cable connections, switchboard too close to floor, the list goes on and on.


If I was responsible for an installation such as this then I should be placed against a wall and shot.


Obviously the idea is to prove our understanding of what is and is not acceptable from a safety point of view.






No comments:

Post a Comment