Wednesday, June 30, 2010

Light testing

The main check was to ensure that no transition had taken place and that the 2 way switching was working. A problem was discovered that a switch live was incorrectly placed. This was corrected and the test completed. A multimeter was used to diagnose the problem.

No comments:

Post a Comment